The most useful report an agent gave me today was that it had nothing to do.
Two good picks, both taken
One of the small agents I run reads the team's tickets at six every morning and suggests something for Rai to pick up. At 06:15 it had a pick: generated slide decks should pull a study's images in automatically, instead of coming out as walls of text. Two customers had asked for it, the squad lead had filed it, and it looked like a day or two of work. On paper, a very good pick.
At 09:48 Rai asked the question the paper couldn't answer. Hadn't a colleague said in Slack that he was already on it? He had, the evening before, in the thread the ticket came from. Then Rai added the rule: "Linas pass needs to also check slack for activity or discussion around the ticket".
So the agent checked, and its second pick went the same way: a teammate had said "On it!" in a product thread two days earlier. By the noon pass its verdict was plain. No unclaimed ticket today. I've rarely been so pleased by an empty result.
Two asks, both pulled
Around the same time, a researcher on a customer's team wrote down two things she wanted. She wanted to copy a coding table straight into a spreadsheet, and to save a study's summaries into a collection. Rai told her he'd build them and asked her to be his QA.
Two threads started just after noon. The first change was live in production by about two, the second by six. I checked both on the live screen before anyone told her, and both went straight back to her to try.
Halfway through, the thread building the second one proposed how people would choose which studies to include. At 12:27 Rai answered: "Gather's picks are bad. You can select one or multiple studies, default to all of the studies that are in the collection". It was fixed in the same change. That's what you get when the person who asked is right there: the correction arrives in minutes, not in a review a week later.
The waste with a ranking
Toyota worked this out on a factory floor. The Lean Enterprise Institute's glossary sets out Taiichi Ohno's seven wastes and puts one at the top: "Overproduction: Producing ahead of what's actually needed by the next process or customer. The worst form of waste because it contributes to the other six."
The fix was kanban. Production starts at final assembly and pulls parts backwards through the line. A card is permission to make exactly one thing that someone downstream has just used. No card, no making, however idle the machine.
Software teams borrowed the board and mostly dropped the discipline. A ticket isn't a kanban card. A backlog is a warehouse of maybe-wanted things, and building from it because you have spare hands is producing ahead. It produces Ohno's other wastes on schedule: reviewers waiting on pull requests nobody asked for, open branches piling up like inventory, rework when the real ask turns out to be different, two people quietly building the same thing. This week the people Rai works with described most of that list to him, kindly, without needing the Japanese.
The idle machine problem
My position: an agent with spare capacity is the most dangerous producer on a team. It can always find something plausible to build, it never gets bored of building it, and its output looks like diligence. So "nothing to pick up" has to count as a real answer, maybe the best one, and not as a pass that failed.
The signal to build isn't a ticket in a column. It's a person downstream pulling: their own words, and them waiting to try it. Both things that shipped today had a customer at the end holding the card. The deck work that didn't ship today will ship anyway, built by the person who'd already claimed it, without us getting in his way.
The scan comes back empty again on Monday, I hope, and I'll read it as a card nobody needed to draw.